Search This Blog

Showing posts with label ECONOMIC DEVELOPMENT. Show all posts
Showing posts with label ECONOMIC DEVELOPMENT. Show all posts

Thursday, November 22, 2018

Bringing the springs back to life

DCSCA has proposed a joint project with the City of Greater Geelong (CoGG) to revive the mineral springs from which Clifton Springs gets its name.

Clifton Springs in its heyday 1890
We believe that at least 3 springs have their outlets between the high and low water marks on the Clifton Springs beach. Originally, they were well above the water line and were the focus of the Clifton Springs spa in the 19th and early 20th centuries, where people from the Geelong and Melbourne regions came to "take the waters" for their alleged health-giving properties.

More recently, the water from the springs has been declared unfit for drinking - ironic, given the early claims that it improved drinkers' health! For this reason, the area has been allowed to deteriorate. Coastal erosion continues to take its toll on the site (see the two photos), with the result that the springs outlets are now submerged by the incoming tide.

Spring into the future?
DCSCA would like the historic springs that gave Clifton Springs its name to “live on” and enhance the experience of visitors to the area. More specifically, we would like the spring water outlets to be revived as an historic feature, visible from the planned boardwalk that will go around the nearby promontary.

We are proposing a three-stage process to revive the springs:
1. Identify and record the location of the spring water outlet (at low tide!). Place a temporary 'collar' (e.g. a concrete tube) over each outlet, so that the spring water discharges above the high water level.
2. Ensure that the boardwalk offers suitable points from which to view all of the spring water outlets and include pointers to each spring, plus information about them, in the fabric of the boardwalk.
3. On completion of the boardwalk, replace the temporary 'collars' with more attractive structures. Invite local artists (e.g. sculptors, glass artists) to submit expressions of interest in creating one or more of these features; and invite local schools, groups, clubs and residents to suggest design ideas.

Photos:
* SpringDale Collectables on Facebook
* A. S. Miner Geotechnical (2011) Coastal erosion and stability study: Clifton Springs. Report to City of Greater Geelong . p22.

Monday, July 25, 2016

DCSCA drafts a strategy for landfill advisory group

DCSCA is a member of a Community Consultation Group created by the City of Greater Geelong (CoGG) to advise it on the management of the Drysdale Landfill site (aka 'the tip'!).

CoGG launched the group at a public meeting in Drysdale on 7 June 2016 and DCSCA intends to be an active member. To that end, it has drafted a Waste Management Strategy, which it intends to present at the Group's next meeting in August.
DCSCA's draft strategy follows.


1.      Aims
Operations at the Drysdale Landfill site should accord with the Barwon Region Waste Management Plan, which should aim to provide the Barwon Region with a best practice Waste Management Plan meeting community expectations; and to promote sustainable built and natural environments.

The Barwon Region Waste Management Plan should meet its aims through four inter-related strategies: minimise the waste dumped at landfill sites; minimise the cost and maximise the convenience of dumping waste at landfill sites; minimise the social, environmental and health-related dangers of illegal dumping of waste; recycle as much as possible of the waste dumped at landfill sites.

Each of those four strategies should have a measurable target and success in meeting each target should be published each year, to promote continuous improvement. E.g.: 70% of customers ‘Satisfied’ or ‘Very Satisfied’ with waste disposal in the region; 10% of litter, odour and run-off from the site.

DCSCA Questions. 1. Does the Barwon Region Waste Management Plan and the Drysdale Landfill site each have its own Objectives Statement? If so .... 2. Can the Consultative Group propose amendments to either Objectives Statement?


2.      Specific objectives
Operations at the Drysdale Landfill site should meet the following objectives:
2.1 Reduce waste. Set annual targets and publishing the results. E. g. phase out single use plastic bottles and plastic bags; teach people a) to reduce the waste they generate and b) to dispose of it selectively into the yellow, green and purple bins; encourage manufacturers a) to reduce their packaging and b) to make their products more easily disposable.
2.2 Re-use waste. Set annual targets and publish the results. E. g. increase the efficiency of material separation and recycling at recycling and waste disposal centres; create a clean site for waste disposal within a 20 mt. drive of each resident of the Barwon Region.
2.3 Recycle waste. Set annual targets and publish the results. E. g. encourage shops to have bins for returning packaging (e.g. bottles, boxes) to manufacturers. Institute an annual award for best performing shop; encourage manufacturers to use the trucks that collect and deliver their goods to shops to carry returned packaging (especially packaging that combines plastic, cardboard and foam) on their return journeys. Institute an annual award for best performing manufacturer. (The manufacturers create the waste, councils and private recycling companies shouldn’t have to clear it up.)
2.4 Generate income from waste to offset costs. Set annual targets and publish the results. E. g. recover precious metals from computers and mobile phones and sell as ‘raw materials’ to local industry to promote the local economy; separate metal, plastic, rubber, paper/cardboard (others?) and sell as 'raw materials' to local industry to promote the local economy; generate power with gases 'harvested' from waste and through high temperature incineration of toxic material; generate wood chips and mulch from 'green waste' and sell to the public.
2.5 Treat waste more efficiently and effectively. Set annual targets and publish the results.
2.6 Dispose of waste more efficiently and effectively. Set annual targets and publish the results. E.g. make disposal easier through providing bins dedicated to product types (e.g., batteries, scrap metal, computers/phones, furniture, beds & bedding); dispose of asbestos separately from general waste; seal it in non-permeable material and burry it in marked sites, to minimise health risks. (At present, asbestos waste is mixed-in with general waste at the tip face.); dispose of paint, chemicals, etc. separately from general waste, to minimise a) health risks and b) illegal dumping.
2.7 Work towards ‘Zero Waste’. Publish progress each year.

DCSCA Questions. 1. What can be done to reduce the cost of a trip to the tip? Illegal dumping is increasing in the Barwon Region, largely due to the high cost and difficulty of a trip to the tip. This could entail a 2 hour round trip, an outlay of over $60, a difficult reversing manoeuver with a trailer and unloading potentially hazardous objects from a trailer. It could also result in a muddy car and trailer.
2. Why is there a charge to dump green waste? Other councils make no charge for green waste. Why does CoGG charge to dump green waste AND mulch and sell it? (A ‘double dip’ at the tip!)

Thursday, April 28, 2016

Bellarine Peninsula misses out on ferry trial

-->
(Source: Herald-Sun)
Businessman Paul Little has announced that on May 16, it will start an eight-week trial of a ferry service between Point Cook and Docklands that won’t include a stop on the Bellarine Peninsula.

In the trial, a catamaran will ferry 400 passengers indoors from Wyndham Harbour near Point Cook, to Docklands' Victoria Harbour in the CBD in the morning peak time; and will return during the evening peak time. Mr Little's Little Group has established a new company - Port Phillip Ferries – to run the service, which will take around 70 minutes each way. The new company wants to reduce the travel time, which it says is due to low speed limits on the Yarra River.

An adult return fare will cost around $20 during the trial, while the normal cost will be $25 for an online booking and $29 if bought on the day, with discounts for seniors, children and concession cardholders. Parking at Wyndham Harbour marina will be included in the fare and ferry passengers will have free wi-fi access.
 
Still no ferry for the Bellarine
When Mr Little first floated his plan for a ferry service in October 2015, it included a stop at Portarlington, but Mr Little said more work was needed to allow ferries to berth there. "We'd be very happy to run the ferries out of Portarlington if the demand was there", he said.

The infrastructure for a Portarlington ferry stop will be completed in the months after the Port Phillip Ferries trial. The 2016 state budget includes money for Stage Two of the $15m ‘safe harbour’ at Portarlington, which includes docking for ferry services and is due to be completed in the 2016-2017 financial year. The budget also includes $107m to build the long-awaited Drysdale bypass which, once complete, will make a Portarlington ferry a more attractive option for people from the western Bellarine who commute to Melbourne.

Begging the question
Point Cook residents who have to spend hours a day travelling to and from jobs in the city would welcome a ferry between Wyndham Harbour and Melbourne’s CBD. Similarly, Bellarine Peninsula residents forced to commute to Melbourne would welcome a ferry between Portarlington and the CBD – either as part of the proposed Port Phillip Ferries service or in addition to it.

However, such ferry services solve a problem that shouldn’t have been created – insufficient business and jobs for the expanding population of Geelong and the Bellarine Peninsula. The City of Greater Geelong has actively encouraged the creation of ever more housing estates, home to many thousands of residents, without ensuring that there are jobs to support them. The result is the creation of 'dormitory towns' as an increasing number of people on the Bellarine joining commuters from Geelong on the hours-long commuter trek to and from central Melbourne.

For example, when the Curlewis ‘growth area’ on the outskirts of Drysdale is completed, it will house  around 16,000 people, yet the area is virtually deserted during the day (apart from builders and tradies building more houses), because so many of its residents are commuters. The only jobs are at the small shopping centre, with its Woolworth supermarket and a handful of ‘speciality’ shops and even these will be at risk as the Leopold shopping centre expands from its present 5,000m2 to 65,000m2 by 2021. (See “More shops, no vision” [13 October 2013] on this blog.)

Creating a jobs drain
An expanded Leopold shopping centre will drain custom from elsewhere on the Bellarine, just as shopping centres in Waurn Ponds and Corio Village have drained custom from central Geelong. The shopping centres provide some new jobs, but most are relatively low-skilled, low-paid and with very limited career paths. Why are there no plans to provide other sorts of jobs?

CoGG's drive to expand the population of the Bellarine must be accompanied by plans to expand and diversify employment. As a rule of thumb, a new job should be created for each house built. That would at least start to match economic growth with population growth.

Thursday, November 19, 2015

DCSCA submits "Top 6" proposals to council's budget program

-->
The Drysdale & Clifton Springs Community Association Inc. (DCSCA) has today lodged its “Top 6” projects with the City of Greater Geelong’s Community Budget Submissions program.
Oh really?

The program invites community groups and organisations to submit proposals for consideration as the council prepares its 2016-17 budget.

Eligible projects would consist of capital works on council assets, but there is plenty of opportunity for local ‘in kind’ contributions by local communities. For example, DCSCA has good links with local clubs, groups and schools; and it would be happy to assist in collecting information for scoping studies and in disseminating their results for public comment.

Below are abbreviated versions of DCSCA’s Top 6 projects. (It was meant to be “Top 5”, but three projects tied for 4th place!)

-->
1. A Swimming Pool at the Drysdale Sports Precinct
The council should create an indoor/outdoor swimming pool and related facilities as part of the Drysdale Sport Precinct, to service the central Bellarine. Council officers have said that the population of Drysdale and Clifton Springs needs be 45,000 to justify a pool; but this figure is based on a recommendation from 2008 – six  years ago – since when the advice and recommendations of health and leisure professionals has changed significantly. For instance, in March 2012, Parks and Leisure Australia (PLA) recommended that a 25m pool should be provided for a population of 30,000 people (http://www.parksleisure.com.au/documents/item/1280).

If a pool in Drysdale were to open tomorrow, it would serve a population of over 35,000 (i.e. well over the PLA recommendation), with summer holiday-makers increasing the figure to approximately 55,000. However, Drysdale is a designated Growth Area, which means that its population will increase to approximately 40,000 by 2019; with summer holiday-makers increasing the figure to approximately 65,000. At the same time, the pressure on Ocean Grove's already overcrowded pool will continue to grow independently, as it, too, is a designated Growth Area; and the imminent closure of the privately owned pool in Portarlington will only make a bad situation even worse.

The project should be in four stages:
1: A scoping study to determine community support; to forecast needs, patronage, benefits and, therefore, design; and to estimate costs.
2: Construct the swimming pool.
3: Construct a Wellness Centre (Hydrotherapy, Gym, Spa, Sauna).
4: Construct waterslides, a diving pool and a competition pool.

-->
Objectives of the project
·      To provide long-term, water-based sporting, health, educational and social benefits to people of the central Bellarine Peninsula, especially the 3,500 students at 3 local kindergartens and 6 local schools.
·      To reduce the costs and the 'carbon footprint' of travel to and from existing pools (e.g. Ocean Grove - over-subscribed already)
·      To increase and diversify local employment and career opportunities.
·      To provide a new attraction to potential tourists.
·      To create economies of scale (infrastructure and staff) by locating it in the Sports Precinct.

-->
2. A lookout tower on Murradoc Hill, Drysdale
The council should design and build a lookout tower on Murradoc Hill, in Drysdale. This is the highest point of the Bellarine Peninsula and it offers panoramic views around the peninsula and over Port Philip Bay to the Mornington Peninsula. A lookout tower at this location would be a ‘must see’ destination – not just for tourists but for Bellarine residents, too. Its attraction would increase traffic in Murradoc Road, offering businesses increasing custom; and the commissioning process could favour local architects and builders, while still seeking value for money.

The project should be in 3 stages:
1: A scoping study to determine community support; to forecast patronage and benefits; to determine site ownership and management; and to set design parameters.
2. Invite proposals (including costs) by competitive tender, actively encouraging local architects and builders to apply, and put them on display for public comment and voting.
3. Commission the construction of the tower and any associated infrastructure.

-->
Objectives of the project:

·      To provide the Bellarine Peninsula with an iconic tourist attraction
·      To increase custom in the  businesses on Murradoc Road
·      To emphasise the tower’s ‘localness’ by actively involving local architects and builders in its design and construction.

3. A Railway Museum at Drysdale Station
The council should collaborate with Bellarine Railway to design and build a Railway Museum at Drysdale Station, as part of Bellarine Railway’s continuing program of renovating and upgrading its sites and rolling stock. The project is likely to attract funds from state and federal governments’ regional funding and from historical and/or rail societies. It is also very likely to attract ‘crowd funding’ (fund-raising online) from rail enthusiasts across the state.

The Museum should be run by a Trust; the council would have no responsibility for its maintenance.

The project should be in 3 stages:
1: A scoping study to determine community support; to forecast patronage and benefits; to determine site ownership and management; to investigate possible sources of Museum contents; and to set design parameters.
2. Invite proposals (including costs) by competitive tender, actively encouraging local architects and builders to apply, and put them on display for public comment and voting.
3. Commission the construction of the Museum.

-->
Objectives of the project:

·      To enhance the attractiveness and social/historical standing of the Bellarine Railway
·      To add to the Bellarine Historical Society’s status as a portal to the region’s history
·      To offer visitors to the area an added incentive to travel on the Bellarine Railway and/or to walk or cycle on the Bellarine Rail Trail.

-->
4. An artificial reef for the Clifton Springs fishing jetty
The council should design and build an artificial reef for the Clifton Springs fishing jetty, as part of its continuing program of improving the stability, access and attractiveness of the Clifton Springs foreshore. The reef will increase fish numbers by offering a relatively safe environment, making the area more attractive to recreational fishers. If practicable, the reef should be made partly or wholly of glass, contributing to the area’s growing reputation as a centre of glass-related activity.

The project is likely to attract funds from state and federal governments’ regional funding. It is also likely to attract ‘crowd funding’ (fund-raising online) from fishing enthusiasts in the region.

The project should have 3 stages:
1: A scoping study to determine community support; to forecast the effects on the usage of the fishing jetty; to determine management of the reef; and to set design parameters.
2. Invite proposals (including costs) by competitive tender and put them on display for public comment and voting. Actively encourage local businesses and glass artists to apply, while still seeking value for money.
3. Commission the construction of the reef.

-->
Objectives of the project:

·      To ensure that fishing at the jetty is sustainable by increasing fish numbers
·      To promote the work of relevant local businesses and glass artists.

4. An artificial reef for The Dell, Clifton Springs
The council should design and build an artificial reef for The Dell at Clifton Springs, as part of its continuing program of improving the stability, access and attractiveness of the Clifton Springs foreshore. The reef will increase the area’s attraction – especially to snorkellers - because it will increase fish numbers by offering a relatively safe environment. Also, it will offer a picturesque view from The Dell lookout. If practicable, the reef should be made partly or wholly of glass, contributing to the area’s growing reputation as a centre of glass-related activity.

The project is likely to attract funds from state and federal governments’ regional funding. It is also likely to attract ‘crowd funding’ (fund-raising online) from snorkelling enthusiasts in the region.

The project should be in 3 stages:
1: A scoping study to determine community support; to forecast the effects on patronage of The Dell; to determine management of the reef; and to set design parameters.

2. Invite proposals (including costs) by competitive tender and put them on display for public comment and voting. Actively encourage local businesses and glass artists to apply, while still seeking value for money.
3. Commission the construction of the reef.

-->
Objectives of the project:

·      To enhance The Dell’s attractiveness a) by increasing fish numbers to encourage snorkelling and b) by offering a picturesque view from The Dell lookout
·      To promote the work of relevant local businesses and glass artists.

 4. Improved access to the Clifton Springs foreshore at Beacon Point
The council should create a new easy and safe access to the foreshore at Beacon Point, as part of its continuing program of improving safety and access at the Clifton Springs foreshore. Easy access and signage should encourage residents and visitors to walk east and west along the Clifton Springs foreshore – perhaps even to take the 2-hour scenic foreshore walk to Portarlington.

The project should have 3 stages:
1: A scoping study to determine community support; to forecast the effects on the foreshore and its infrastructure; and to set design parameters.
2. Invite proposals (including costs) by competitive tender and put them on display for public comment and voting. Actively encourage local businesses to apply, while still seeking value for money.
3. Commission the construction of the new access point.

Objectives of the project:
·      To encourage greater use of the Clifton Springs foreshore for health & recreation.
·      To promote the work of local businesses involved in the project.



Signage for Scenic Trails in Drysdale and Clifton Springs (also submitted)
The council should provide signage at strategic points to identify existing scenic trails for walkers and cyclists. The trails link points of interest and scenic locations around Drysdale and Clifton Springs, such as The Dell Lookout, Lake Lorne, McLeod’s Waterholes and Griggs Creek.

Identifying and promoting these scenic trails will attract more visitors to Geelong and the Bellarine, which DCSCA believes could become an internationally-recognized destination for recreational walkers and cyclists. DCSCA has actively promoted scenic trails in Drysdale, Clifton Springs and the Bellarine Peninsula more broadly. As a result, some are identified in the REMA Tourist Information Map and in the 2014 North Bellarine Business and Services Directory.

The project could start with four signs: at Drysdale Station, the Boat Harbour, The Dell lookout and a location on the Rail Trail.

The project is likely to attract sponsorship, because State and Federal Governments, businesses and service groups would be glad to be associated with it.

Objectives of the project
·      To promote the central Bellarine to potential tourists, especially recreational walkers and cyclists.
·      To reduce health costs by improving community health and well-being through active recreation and social activity.


Monday, October 12, 2015

DCSCA's Big Night Out!

The Drysdale and Clifton Springs Community Association (DCSCA) will hold its Annual General Meeting on Wednesday 21 October at 7.00pm at SpringDale Neighbourhood Centre, 17-21 High Street, Drysdale 3222.

DCSCA's AGM is its most important event of the year. It's where the DCSCA Committee tells DCSCA members about its work in the past year and invites their responses.

Progress on the foreshore
DCSCA's 2015 AGM will feature Ralph Roob, Senior Environmental Engineer at the City of Greater Geelong's Environment & Natural Resources Department. Ralph has been in charge of the extensive work being done to the Clifton Springs Foreshore and he will update us on progress and plans. Ralph has conscientiously kept DCSCA informed about progress throughout this major project and he's a good speaker, so we're looking forward to his presentation.

The DCSCA Committee

DCSCA's AGM is also when DCSCA members elect a new Committee to run the association for the next year. The Committee consists of four officers (President, Vice President, Treasurer, Secretary/Public Officer) and ten members.

At its monthly meetings, the DCSCA Committee discusses and responds to local events and issues. The committee represents local views on local planning and development matters; and It also initiates events, including the annual Dell Environment Day (16 October), the annual Clean Up Australia Day and the annual Festival of Glass (February).

DCSCA meets Cllr. John Doull (5)

On 12 May, DCSCA Committee members met Councillor John Doull at City Hall. This was the fifth of the quarterly meetings that DCSCA has initiated with the two City of Greater Geelong (CoGG) Councillors whose wards coincide with DCSCA's area - the other is Councillor Rod Macdonald.
It was a very busy and productive meeting!

Roadside council notice boards
First, we raised the issue of the lack of roadside council 'welcome/what's on' notice boards on which to advertise events in our towns. These can be seen in towns elsewhere on the Bellarine, but not in ours. Cllr. Doull said that money was available for this from last year's budget and that he would talk to Cllr. Macdonald about each of them funding signs in their respective wards.

A swimming pool in Drysdale & Clifton SpringsWe said that there is clear - and growing - demand for a swimming pool in Drysdale & Clifton Springs, not least because the Ocean Grove pool is over-subscribed. However, there are no plans for a pool in the regional sports/recreation 'hub' at the junction of Andersons Road and Grubb Road in Drysdale. We suggested out that this is an issue facing people not just in Drysdale & Clifton Springs but along the North Bellarine, especially because of the uncertain future of the pool in Portarlington. We emphasised that although the council has no plans for a opool and despite council officers saying that the case for providing one was weak, DCSCA would persist in raising the matter, because of the strong local feeling about it. Cllr. Doull promised to raise the matter with Mr. Dean Frost (CoGG's Manager of Projects, Recreation & Central Gelong) and to invite him to talk about it at our next quarterly meeting.

Local economic development
DCSCA is suggesting that CoGG builds on the success of the 2011 Festival of Glass and uses the build-up to the 2012 Festival to announce a local business support program (e.g. advice and mentoring, assistance to explore new markets, rates relief) for small art and craft business on the Bellarine. That program could link with the 'Made in Geelong' initiative, which offers small businesses short-term leases on empty shops in central Geelong, enabling small art and craft businesses on the Bellarine - individually or in partnerships - to test their economic viability in a town center. We invited Cllr. Doull to support the proposal and he said that he would discuss it with Mr. Terry Demeo (CoGG's Manager of Planning Strategy and Economic Development), Ms. Kaz Paton (CoGG's Manager of Arts and Culture) and Mr. Steve Bentley (CoGG's Manager of Events, Central Geelong & Waterfront) and get back to us.

Then, we outlined DCSCA's argument that CoGG should build on the growing local concern about rising sea levels to develop the Bellarine Peninsula as a demonstration of a post-carbon economy. Cllr. Doull outlined Future Proofing Geelong - a strategy to develop Geelong in enironmentally sustainable ways - that includes a plan for low-carbon growth. (Future Proofing Geelong is launched today, May 12 2011.) Future Proofing Geelong is to have three 'reference groups' - 'Major Enterprises', 'Small & Medium Enterprises' and 'Community'. Major enterprises in Geelong have been involved in developing Future Proofing Geelong and the other two reference groups will be established in June 2011. Cllr. Doull suggested that we contact Ms Samantha Smith (CoGG's Co-ordinator, Future Proofing Geelong) to ask about becoming involved in the 'Community' reference group. Finally, we suggested that Geelong could use its role as host of the forthcoming Sustainable Economic Growth for Regional Australia conference to showcase some initiatives around local business support and a post-carbon economy. Cllr. Doull said that he would outline Future Proofing Geelong to that conference and that as Cllr. Rod Macdonald was leading preparations for the conference, we should approach him about our possible involvement.

Site-specific issues
Next, we discussed a series of issues specific to particular areas in our towns. We discussed the uncertainty around whether there would be an official 'launch' at The Dell of the new signage and the new lookout and we said that we would investigate further. Cllr. Doull suggested that we ask Mr. Mark Gallon (CoGG's Manager of Strategic Projects) about the possibility of releasing potable mineral springs water at The Dell by targeted drilling, associated with building another groin to protect the foreshore.

This led to a discussion of the development of a Masterplan for Beacon Point Reserve in Clifton Springs, for which $20,000 has been allocated in the council's 2011/12 budget. Cllr. Doull said that he wanted to see the area kept as a 'wild' place, identified clearly as a Reserve, with the addition of maybe a toilet block, a community meeting place and, perhaps, some appropriate sculpture. We said that DCSCA welcomed the proposal, which reinforces DCSCA's Open Space Network, which we launched last year to protect our remaining open spaces from development. Beacon Point Reserve is one of the nine open spaces in the Network, which we want to see linked by walking/cycling tracks. As a first step, we are seeking grant funding for a Northern Bike Trail (Drysdale Station, to the town centre, to the Recreation Reserve [Market area], to McLeods Waterholes, to Griggs Creek, to the Bay, to the Boat Ramp, to Drysdale station). Cllr. Doull applauded our initiative, advised us to ensure that major road crossings wouldn't be a problem and said that he would be happy to provide us with a letter of support to use in our fund-raising.

Finally, we raised two issues concerning the Springs Street area of Clifton Springs - another site in DCSCA's Open Space Network. First, CoGG recently employed a contractor to spray systemic weedkiller along the water course, with the result that the banks now feature matted dead vegetation. While this may be acceptable action in a drain, local residents have argued strongly that they regard the 'drain' as a water course, i.e. a potentially attractive feature of the area and DCSCA actively supports their view. Second, a new wall has been built between the Bowling Club and an adjacent property with the aim - as we understand it - 0f protecting that property if the Club's new dam is breached. Between the new dam and the new wall lies the Springs Street land - flood-prone already and apparently in danger of further floods from the Club's new dam. We argued that both the spraying and the new wall were ewvidence that the land is unsuitable for 'development' and should be rezoned - in accordance with local people's wishes - as 'Open Space'. Cllr. Doull said that he would talk to CoGG engineers about both issues and get back to us.

DCSCA's next quarterly meeting with Cllr. Doull will be on Thursday 4 August 2011. Any residents of the Drysdale/Clifton Springs area are welcome to ask DCSCA to raise any issue of concern with Cllr. Doull.